HOME - TRANSPORTATION - Bogota Metro

Representative Projects

Sistema Transmilenio
- Caracas Avenue

- NQS Avenue
- Américas Avenue
- Bogotá Subway

 



Bogota Metro


Since 1991, INGETEC S.A. has been consultant both for the City Administration and the National Government to study the most attractive solution for the City’s Mass Transportation System. Bechtel and SYSTRA overseas companies conducted the latest studies in order to study the financial and institutional aspects required for the development of the First Metro Line for the City of Bogotá. This line would have a capacity of 56,000 passengers/hr/way and length of
29 km with 23 stations; the study includes 6.6 km of subway routes in the central area of the city.

Services rendered:

  • Analysis of Transportation and Traffic demand.
  • Transportation planning.
  • Multi-mode Urban Transport Systems.
  • Traffic engineering.
  • Metro System.
  • Highways.
  • Public Transportation Models.
  • Economic and Financial Studies.
  • Port Studies

Client:

Instituto de Desarrollo Urbano – IDU (Urban Development Institute)

Location:

Bogotá D.C., Colombia

Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co