Termocentro (combined cycle)


Conversion of the Termocentro combined cycle thermal power plant into natural gas, which includes two simple-cycle combustion turbines, 100 MW each, for a total installed capacity of 300 MW.

Services rendered:

Engineering supervision of the contractor’s activities:

1. Design of civil works and equipment
2. Construction of the civil works
3. Erection, start-up and commissioning of equipment
4. Design and environmental management (social and physicobiotic)
5. Industrial safety and occupational health

Technical characteristics:

Boilers: Two horizontal-flow, heat-recovery boilers, with 283,8 ton/h main vapor at 516°C and 87 bars, and 64 ton/h secondary vapor at 293°C and 10,6 bars.

Turbogroup: One double-pressure turbine at 3600 rpm with a130 MVA generator, 13,8 kV and 0,8 cosF.

New substation: 230 kV, simple busbar, 5-field, conventional type.

Control system: Enlargement of existing distributed digital system.

Cooling system: Closed-circuit with induced-draft cooling tower.Water supply: three 260 m shafts, with 50 l/sec pumps and increase of existing pumping capacity to two 20 l/sec pumps.

Client:

ISAGEN S.A. E.S.P.

Location:

Puerto Puerto Olaya, Cimitarra, Administrative Department of Santander

Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co