Representative
Projects
-
Termoyopal
- La
Sierra
- Termocentro
- Martin
del Corral
|

La Sierra Thermal
Power Plant
Gas-operated power station for generating electricity by means of two
150 MW open-cycle units.
Services rendered:
Engineering supervision of the following works commissioned from the
Contractor:
- Design,
fabrication, nationalization, transportation, erection, start-up and
commissioning of turbines, speed regulators, generators, voltage and
excitation regulators and grounding, auxiliary mechanical and electrical
equipment, power transformers, substation, control and communications.
- Design,
supply of materials and construction of civil works for the foundation
slabs for equipment and powerhouse, control building, administration
building, substation building, warehouse, workshop, laboratory, access
roads, ancillary works, drainage works, superintendent’s office
and surveillance box.
- Environmental
management - Biophysical component. Compliance with environmental
management plans, permit and license processing required by the environmental
authorities, compliance with environmental legislation and mitigation
of unforeseen impacts within the project’s natural environment.
Air pollution control, occupational health and industrial safety,
solid and liquid waste treatment, quarry protection and reclamation,
environmental management of the gas pipe corridor, river underpasses
and new high- voltage transmission lines.
- Environmental
management - social component. Accompaniment rendered to the community
affected by the project, environmental awareness and education programs
given to the community, creation of new jobs, and landscape, right-of-way
and recreational areas.
Technical
characteristics:
Turbogroups: Two turbo generating units,
each with a 150 MW gas-operated turbine and a 211 MVA three-phase, hydrogen-cooled,
synchronous generator at 3 000 rpm and 18 kV.
Gas supply to the plant: Underground gas
pipe, f = 14” 2,800 m long, including a 780-m long river underpass.
Substation: A 18 400 m² switchyard
divided into the power generation area and the 230 kV power transformers
area. The substation has a 633-m² steel and concrete control building.
Fire fighting system: Diesel, electric
and Jockey pumps. Smoke-detecting equipment and sprinkler system. Foam
system for liquid fuel tanks.
Dock: Lateral-type dock on the Magdalena
River with three disembarkation levels and its corresponding access
platforms to the plant.
Railway: Equipment and fuel oil transportation
alternative. Railway branch between La Dorada and Puerto Berrío,
590 m long, of which 150 are double-track.
Power station: 3,120 m² steel structure
housing two turbo generators and corresponding ancillary equipment.
Control and administration building: Two-story
reinforced concrete structure with an area of 1,380 m².
Water treatment plant: 365 m² steel
structure housing demineralized water production equipment and raw,
effluent and sewer water treatment equipment.
Shop and storage facility: 1,585 m²
steel structure housing the shop, the plant maintenance warehouse and
auxiliary offices.
Camps: prefabricated structures mounted
on cast-in-place concrete slabs, covering an area of 1,495 m²,
with access roads and water and wastewater utilities, a fire-fighting
network, electric power and voice-and-data communications equipment.
Client:
Empresas Públicas de Medellín E.S.P (Medellín Public
Utilities Company)
Location:
La Sierra township, within jurisdiction of the municipality of Puerto
Nare, in the Administrative Department of Antioquia. The site is located
215 km west of the City of Medellin, on the right bank of the Magdalena
River, downstream of the confluence of the Nare and Magdalena Rivers.The
power plant is located 127 masl, has a mean temperature of 28º
C and 81% relative humidity.
|
|