|
||||||||||||||||||||||||||||||||||||||
| HOME - HYDROPOWER PROJECTS - Tablachaca | ||||||||||||||||||||||||||||||||||||||
|
Proyectos Representativos - Guavio
|
Assessment
of the current situation on the Mantaro Hydroelectric Complex, including
assessment on the 70-m high concrete gravaity dam, diagnosis on the
reservoir stability problems, assessment of the 20-m long headrace tunnel
operation and resevoir; and refurbishing of the facilities and of the
instrumentation and control equipment. |
|||||||||||||||||||||||||||||||||||||