Proyectos
Representativos
- Guavio
- Miel
I
- Salvajina
- Porce
III
- Boruca
- Tablachaca
- Chivor
- Calima
- Pajarito
- Río
Frío
- Mesitas
|

Pajarito
Pajarito Hydroelectric Project is located in the Administrative Department
of Antioquia. The power plant has an installed capacity of 4,75 MW generated
by a Francis turbine; the head is 124 m and the design flow is 4,75
m³/s. The penstock is 712 m long and an inner 1,2 m diameter. The
additional works include a discharge channel.
Services rendered:
Ingetec S.A. carried out the detail designs for the civil works and
the electromechanical designs for the conveyor belt and the power plant,
as well as rendered technical advisement during construction.
Main
characteristics:
4,75 MW Francis-type turbine .
712 m long, 1.2 m diameter penstock.
Cliente:
Empresas Públicas de Medellín – EPM (Medellín
Public Utilities)
Location:
Antioquia, Colombia.
|
|