Pajarito


Pajarito Hydroelectric Project is located in the Administrative Department of Antioquia. The power plant has an installed capacity of 4,75 MW generated by a Francis turbine; the head is 124 m and the design flow is 4,75 m³/s. The penstock is 712 m long and an inner 1,2 m diameter. The additional works include a discharge channel.

Services rendered:

Ingetec S.A. carried out the detail designs for the civil works and the electromechanical designs for the conveyor belt and the power plant, as well as rendered technical advisement during construction.

Main characteristics:

4,75 MW Francis-type turbine .
712 m long, 1.2 m diameter penstock.

Cliente:


Empresas Públicas de Medellín – EPM (Medellín Public Utilities)

Location:

Antioquia, Colombia.

Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co