Guavio Hydroelectric Project Gas-Insulated Substations

Aboveground 230 kV Gas-insulated Substation.

Description:

230 kV SF6 gas-insulated substation (GIS) with segregated-phase. The substation has double busbars with transfer switches. The main components of the substation are:

  • Nine 230 kV transmission lines, 2000 A
  • Two 230 kV bays, 4000 A, for the SF6 gas-insulated bus ducts connecting aboveground and underground substations.
  • One 230 kV bay, 2000 A for the 230/115/13.8 kV, 18-24 MVA OA/FA station transformer.
  • One 230 kV bay, 4000 A, for the bus coupler.

Services rendered:

Ingetec carried out the planning, basic design and was consultant during construction.

Client:

Empresa de Energía de Bogotá - EEB (Bogota Electric Energy Company)

Location:

Mámbita, Adminsitrative Department of Cundinamarca, Colombia.

230 kV Underground Gas-insulated Substation

Description:

230 kV SF6 gas-insulated substation (GIS) with segregated-phase enclosure. The substation has double busbars with transfer switches. The main components of the substation are:

  • Five 230 kV, 2000 A, for the generating units.
  • Two 230 kV bays, 4000 A, for the SF6 gas-insulated bus ducts connecting the underground and aboveground substations.
  • One 230 kV bay, 4000 A, for the bus coupler.

Services rendered:

Ingetec carried out the planning, basic design and was consultant during construction.

Client:

Empresa de Energía de Bogotá - EEB (Bogota Electric Energy Company).

Location:

Mámbita, Administrative Department of Cundinamarca, Colombia.

Outdoor Substation at 230 kV

Description:

SF6 Substation at 115 kV with each phase independently insulated. The substation has single buss and its main components are:

  • Two bays 1250 A, 115 kV for the outgoing lines from the project.
  • One bay 1250 A, 115 kV for the transformer 230-115-13.8 kV 18-24 MVA OA/FA.
  • Three bays 1250 A, 115 kV for two transformers 10 MVA, 115-4.16 kV and one 115-34.5 kV.

Services rendered:

Ingetec carried out the planning, basic design and was consultant during construction.

Client:

Empresa de Energìa de Bogotá- EEB.

Location:

Mámbita, Cundinamarca, Colombia
.

Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co