Chivor Hydroelectric Project 230 kV Substation
230 kV switchyard.
Description:
230 kV conventional outdoor switchyard, equipped with main and transfer
busbars. The main components of the substation are:
- Eight
bays for the generating units.
- Six
bays for the transmission lines.
- One
bay for the 230/115/13.8 kV station transformer.
- Two
bays for the bus couplers
Services rendered:
Ingetec was
commissioned with the feasibility studies, the basic design construction
supervision.
Client:
Interconexión
Eléctrica S.A. – ISA.
Location:
Santa María,
Administrative Department of Boyacá, Colombia.
|
|