Chivor Hydroelectric Project 230 kV Substation

230 kV switchyard.

Description:

230 kV conventional outdoor switchyard, equipped with main and transfer busbars. The main components of the substation are:

  • Eight bays for the generating units.
  • Six bays for the transmission lines.
  • One bay for the 230/115/13.8 kV station transformer.
  • Two bays for the bus couplers

Services rendered:

Ingetec was commissioned with the feasibility studies, the basic design construction supervision.

Client:


Interconexión Eléctrica S.A. – ISA.

Location:


Santa María, Administrative Department of Boyacá, Colombia.

Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co