|
||||||||||||||||||||||||||||||||||||||
| HOME - OIL INDUSTRY – Pacific White Products Pipeline | ||||||||||||||||||||||||||||||||||||||
|
Representative
Projects
|
![]() Pacific White Products Pipeline Engineering supervision during Construction of the Pacific White Products Pipeline - Sector 2; replacement of existing Pipeline between El Gallinero and the township of Mulaló. Contract DIJ - 849.The work consisted of the installation of 82 km of buried f12” x 0.344” diameter and 0.250” diameter, type 5L Grade X65 white products pipeline, 509 m of main water course crossings, 909 m of secondary water course crossings and 23,630 m of road-side pipe installation. Client: Empresa Colombiana de Petróleos – ECOPETROL (Colombian Oil Company). Localization: Jurisdiction of Buenaventura, Dagua, La Cumbre and Yumbo, Valle del Cauca Adminsitrative Department. |
|||||||||||||||||||||||||||||||||||||