Representative
Projects
- Miel I
- Sogamoso
- Bogotá-Girardot
- Andaquí
- Cerrejón
- San Rafael
- La Loma-Santa marta
- Betania-San Bernardino
- Acueducto de Bucaramanga
- Yanacocha Mining
|

San
Rafael Reservoir
San
Rafael Reservoir Environmental Monitoring Program.
San Rafael Reservoir environmental monitoring program was undertaken
before initiation of the construction stage, during the works, and two
years thereafter. Monitoring was performed on the aquatic system by
evaluating the physicochemical and biological parameters (benthos, periphyton,
phytoplankton, zooplankton) and by modeling the quality of pond water.
Monitoring was conducted along the Teusacá River basin and in
the reservoir area after reservoir filling.
A social conditions characterization was conducted within the areas
of influence of the project through revision of secondary data, fieldwork,
interviews and direct observation as well as the social characterization
of the population directly affected by the project.
Client:
Empresa de
Acueducto y Alcantarillado de Bogotá - EEAB E.S.P. (Bogota Water
and Wastewater Company).
Location:
La Calera
– Administrative Department of Cundinamarca (Colombia).
|
|