HOME - LAND RECLAMATION - Cucuana
Representative Projects

- Cucuana
- Magará
- Riofrio
- Alto Chicamocha

 


Cucuana


Engineering supervision during construction of the dam, intake and conveyance works for the Cucuana River.

Supervision for completion of the Cucuana River Works.

Completion of the intake and conveyance works for the Cucuana River through the Jardín – Guaduas Channel, with an irrigation capacity of 24 m³/s, and conveyance system 38 km long, which benefits an area of 25,000 ha, located between the Municipalities of Guamo and Espinal.

The project consisted of the construction of new civil works and completion of existing works amongst which are overhead channels, box culverts, piles, vehicle and pedestrian bridges, viaducts, concrete lines channels, earth channels, gate installation, excavations, embankments and roads.

Services provided:

Engineering supervision.

Client:

Asociación de Usuarios Distrito Adecuación de Tierras Rios Coello-Cucuana.

Location:

Guamo, Administrative Department of Tolima.

Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co