Chingaza


The Chingaza Project is the most attractive fresh water source for the City of Bogotá’s water supply system. The eastbound Guatiquía and Chuza Rivers were diverted by gravity back into the Chuza reservoir, whereas other watercourses of the west Rio Blanco watershed area were diverted into the free-flow portion of the main tunnel.

The first stage comprised of the following structures:

  • Golillas Dam: 127-m high concrete face gravel fill structure.
  • Chuza Reservoir: 223 Mm³, impounding the 6,4 m³/sec Chuza River.
  • Diversion of Guatiquía River´s 5,9 m³/s average flow into the Chuza reservoir, by means of a 3,0 m diameter, 3,2-km long tunnel, with a maximum capacity of 30 m³/sec, and Leticia Creek’s 200 lt/sec mean flow, through a 300-m long gallery.
  • Chuza – Wiesner Treatment Plant conveyance system: 37,7 km long, with a flow capacity of 25 m³/sec, comprises the following sectors:

    - Palacio - Rio Blanco Tunnel: 28,4-km long and variable diameter of 2,7 m and 3,7 m.
    - Simayá Channel: 0,3 km long.
    - El Faro tunnel: 0,9 km long.
    - Simayá concrete pipe: 4,5 km long and 3,0 m diameter.
    - Siberia tunnel: 3,0 km long.
    - Teusacá siphon: 0,6 km long.
  • Rio Blanco conveyance intake structures, composed of 26 intakes that intercept a series of creeks with a total flow of
    3,0 m³/sec, 13 km of surface pipes and four shafts that discharge into the free-flow portion of the Palacio – Rio Blanco Tunnel.
  • Francisco Wiesner Treatment Plant, with a nominal capacity of 14 m³/sec, direct filtration system, composed of a stilling tank and a spillway, a quick-mix hydraulic structure, a system of 16 filters and a potable water storage tank.
  • Wiesner Plant – City Conveyance System, composed of the following sectors:

    - 0,4-km long pipe.
    - 2,2-km long Usaquén tunnel.
    - 300-m long Santa Bárbara tunnel.
    - 0,5-km long Santa Ana pipe (connects to the northbound distribution network).
    - 9,0-km long Los Rosales tunnel (connects to the southbound distribution network)

Services rendered:

Design and construction supervision.

Client:


Empresa de Acueducto y Alcantarillado de Bogotá - E.S.P. (Bogota Water and Wastewater Company).

Location:


Bogotá D.C. - Cundinamarca
(Colombia)

Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co