HOME - EXPERIENCE - Hydropower Projects



Representative

Projects

- Guavio
- Miel I
- Salvajina
- Porce III
- Boruca
- Tablachaca
- Chivor
- Calima
- Pajarito
- Río Frío
- Mesitas

Hydropower Projects

INGETEC S.A. has been a leading company in the development of large engineering projects in the electric power generation field in Colombia, from their initial planning stages, through pre and feasibility studies, supervision and technical consultancy during the design and construction stages, to final commissioning and start-up.

Scope of Services:

  • General conception
  • Rock fill dams
  • Concrete face dams
  • RCC dams
  • Concrete arch dams
  • Tunnels
  • Caverns
  • Spillways
  • Intake structures
  • Surge chambers
  • Penstocks
  • Powerhouses
  • Electrical equipment
  • Mechanical equipment
  • Control equipment
  • Communications equipment

The company has been commissioned with the development of
thirty-eight hydroelectric projects with a total installed capacity of
17 500 MW, of which 5 000 MW are currently in operation. Several of these projects include a dam and an underground powerhouse that have gained worldwide acknowledgement due to their magnitude and complexity.


Guavio

Guavio Hydroelectric Project is located in the province of Guavio in the Administrative Department of Boyaca... more
Miel I

This roller compacted concrete (RCC) dam is
188 m high, the highest of its type in the world...
more
Salvajina

Concrete face gravel and rockfill dam, 148 m high, and 400-m long crest. In order to undertake... more
Porce III

The project consists of impounding the Porce River by construction of a 151-m high CFRD dam with... more
Boruca

Technical, environmental, financial and market feasibility study, for the Boruca Hydroelectric Project,... more
Tablachaca

Assessment of the current situation on the Mantaro Hydroelectric Complex, including... more
Chivor

The Chivor Hydroelectric Project includes a 237-m high rock fill dam, an open channel (chute) spillway... more
Calima

INGETEC S.A. undertook for the Cauca Valley Authority (Corporación Autónoma Regional del Valle del Cauca – CVC)...
more 
Pajarito

Pajarito Hydroelectric Project is located in the Administrative Department of Antioquia. The... more
Río Frío

The Rio Frio Project was developed by the Tulua Electric Power Company. The main civil... more
Mesitas

Mesitas Hydroelectric Project comprises two in-series power plants: El Paraíso and La Guaca. The main structures of the... more
Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co