HOME - EXPERIENCE - Land Reclamation


Representative Projects

- Cucuana
- Magará
- Riofrio
- Upper Chicamocha

 

Land Reclamation

INGETEC S.A. has participated in the planning, design, supervision during construction, manufacturing, start-up and commissioning of a number of irrigation and land management projects, such as the Magará Irrigation Project which benefits more than 10,000 ha with an irrigation flow of 20 m³/s.

Scope of Services:

• Planning.
• Evaluation of demand and water sources for irrigation.
• Design of irrigation and drainage systems.
• Design of intakes, gravel and sand traps, and water supply channels.
• Design of flood control systems.
• Design of reservoirs and appurtenant works for irrigation.
• Evaluation of geomorphology and river dynamics.
• Environmental studies.
• Management and regulations plans for basins.


Cucuana

Engineering supervision during construction of the dam, intake and conveyance works for... more

Magará

Detail designs of the intake structure, sand trap, 73-km long main irrigation channel...
more

 Riofrio

Conceptual evaluation of the studies and designs for the Riofrío Small Power Plant... more
Upper Chicamocha

Engineering supervision during construction of the center core rockfill La Copa Dam and...more
Hydropower Projects

Transmission Lines and
Substations

Thermal Power Plants
Water and Wastewater Systems
Industrial Development
Roads and Highways
Transportation
Telecommunications
Oil Industry
Mining
Land Reclamation
Rural Development
Environmental Studies 
Claims, Disputes and Arbitrations


Home  |  Company  |  Service  |  Experience  |  Brochures  |  Site Map  |  Spanish   |   Contact



Copyright© 2004, Ingetec S.A. All rights reserved.
www.ingetec.com.co